โ† All Models/107-THE COMPOUND
Model 107

107-THE COMPOUND

Designed for those who want more space, more flexibility, and more lifestyle. The Compound combines 2,950 sq ft of premium living with expansive outdoor spaces, a private gym, dedicated office, and luxury-inspired design built for modern families and elevated living.

2,950
sq ft
4
Bedrooms
3
Bathrooms
US$498K
DIY From
US$975K
Installed From
107-THE COMPOUND  โ€” exterior
Quick Specifications
Footprint
2950 sq ft
Building Size
49 X 57
Roofing
I joist and Trusses
BC Step Code
Step Code Level 3
Build Time
16 Weeks
Tour the build

Inside the 107-THE COMPOUND .

Features & Systems

What goes into every 107-THE COMPOUND .

Structure

  • โ€ขEngineered timber floor joists at 19.2" o.c.
  • โ€ขPanelized 2x6 wood frame walls
  • โ€ขEngineered I Joist roof System and Engineered Trusses
  • โ€ขConcrete foundation system

Envelope

  • โ€ขRain screen and vapor barrier
  • โ€ขR-22 wall insulation
  • โ€ขR-40 attic insulation
  • โ€ขDouble-pane windows standard

Mechanical

  • โ€ขCold-climate heat pump
  • โ€ขHRV with HEPA-grade filtration
  • โ€ขHeat-recovery DHW
  • โ€ข200A main service panel (EV-ready)

Interior Finishes

  • โ€ขQuartz countertops
  • โ€ขSoft-close panelized cabinetry
  • โ€ข9' ceilings
  • โ€ขEngineered hardwood floors
Wall System Breakdown

Engineered, panel by panel.

  • โ€ขPanelized wood-frame construction
  • โ€ขFactory-controlled quality at every stage
  • โ€ขContinuous exterior insulation
  • โ€ขBuilt-in service cavity for wiring + plumbing
107-THE COMPOUND  โ€” wall system diagram
  • โ€ขEngineered for code compliance + high snow loads
  • โ€ขTriple-pane window upgrade available
  • โ€ข3rd-party tested for air-tightness
  • โ€ขDays, not weeks, to assemble on-site
Detailed Specifications

The full spec sheet.

ComponentMaterialSpecificationNotes
FoundationConcrete Forms8" WallTorch On Membrane Foundation Waterproofing
Floor SystemEngineered I-Joists 11.875 @ 19'2 O.C.OSB sub floor glewed and screwed
Exterior Walls2X6 Wood Stud 9" Tall, 16 O.C. Continuous R-Value >22
Windows Vinyl, Double Pane U 0.18\ SHGC 0.30Triple Pane Upgrade Available
RoofingStanding Seam Metal 26-gauge, 16 panel 40-yr Finish Warranty
HVACCold Weather Heat Pump 9 SEER / HSPF 12.5 / -25ยฐC
VentilationHigh Efficiency HRV 200 CFM, 80% recoveryHEPA-13 filtration
Performance Comparison

How the 107-THE COMPOUND rates.

Energy Efficiency25%
Lower energy loss than conventional build average
Structural Strength80%
Exceeds NBC 2020 by 40%
Build Speed80%
14 weeks vs. 32 weeks site-built
Air Tightness40%
2.50 ACH50

Annual Operating Costs

New Leaf Conventional Build
JanFebMarAprMayJunJulAugSepOctNovDec
Walkthrough

See it in motion.

Location & Availability

Where we deliver.

Delivery available within 1,500 km of any New Leaf Vision facility. Lead times depend on configuration and current production queue.

Loading mapโ€ฆ
BC+Alberta
Available-16 Week Lead Time
Ontario+Quebec
Available-24 Week Lead Time
Texas
Available-24 Week Lead Time
Florida
Available-24 Week Lead Time
Mexico-Bahia de Banderas
Available-16 Week Lead Time

Start Your Project

Ready to build your 107-THE COMPOUND ? Our team will guide you through every step โ€” from site assessment to keys in hand.

1
2
3

Tell us about your project

We'll match you with the right model and territory pricing.

107-THE COMPOUND
Chat with us ๐Ÿ‘‹